01.27
Thu
大岡川、蒔田橋の側道でボーリング工事が行われていて、もう2ヶ月近くになります。10mくらいは掘削できるボーリングマシーンが設置されています。大がかりな工事の様子です。
Construction is being carried out on a side road near Maita bridge in Ouoka river, and about two months have passed. A boring machine capable of excavating about 10m is installed.
Construction is being carried out on a side road near Maita bridge in Ouoka river, and about two months have passed. A boring machine capable of excavating about 10m is installed.